Monday, June 8, 2009

House Updates & Family

The house is coming along really well. In the last two weeks they put in the door frame on our master bathroom. It was supposed to be an open arch, but with Ken's schedule there was going to be no way that we could make it work without a door. They also put the plumbing in the master bathroom for our double sinks. This week they put in all the drywall in the house. It looks so closed in now and smaller than when it was just framed, but it's looking more like a house. The canned lighting went in the kitchen. Luckily, we will have smaller lights throughout the kitchen rather than one bigger one. Ken was excited to see that his surround sound pre-wire was done too. Here are some pictures:

The doorway to our Master bedroom.

One of the pre-wires for surround sound.

The archway coming into the living room from the front door.

In the laundry room I noticed a carved out hole in the ceiling. It looks like that will be an opening into the attic. There's a light switch up there. I never thought I'd be so excited to see attic space but with 2 bedrooms and the 2nd one with a small closet I was happy to see more storage space.

This was on the ceiling in the 2nd bedroom. Evidently this drywall was supposed to be on a wall with a door. Hmmm...

No comments:

Post a Comment